Central Area Transmission System

The Central Area Transmission System (known as CATS) is a natural gas transportation and processing system that transports natural gas through a 404 kilometre pipeline from the Central North Sea to a reception and processing terminal at Teesside in the North East of England. == History == Plans for the site began from the discovery of BP's Lomond field in May 1972.

Source: Wikipedia — Central Area Transmission System (CC BY-SA 4.0)

Central Area Transmission System

The Central Area Transmission System (known as CATS) is a natural gas transportation and processing system that transports natural gas through a 404 kilometre pipeline from the Central North Sea to a reception and processing terminal at Teesside in the North East of England. == History == Plans for the site began from the discovery of BP's Lomond field in May 1972.

Source: Wikipedia "Central Area Transmission System" · CC BY-SA 4.0

Share this article: X · Bluesky
Privacy Policy