Chittenango Landing Dry Dock Complex
The Chittenango Landing Dry Dock Complex provided dry dock for canal boats on the old Erie Canal. The original complex was built in 1856 and abandoned after this section of the "enlarged" Erie canal was bypassed by the new barge canal in 1917.
Source: Wikipedia — Chittenango Landing Dry Dock Complex (CC BY-SA 4.0)