Corrib gas project

The Corrib gas project (Irish: Tionscanamh Ghás Aiceanta na Coiribe) is a developed natural gas deposit located in the Atlantic Ocean, approximately 83 kilometres (52 mi) off the northwest coast of County Mayo, Ireland. The project includes a natural gas pipeline and an onshore gas processing plant, which commenced gas production in 2015.

Source: Wikipedia — Corrib gas project (CC BY-SA 4.0)

Corrib gas project

The Corrib gas project (Irish: Tionscanamh Ghás Aiceanta na Coiribe) is a developed natural gas deposit located in the Atlantic Ocean, approximately 83 kilometres (52 mi) off the northwest coast of County Mayo, Ireland. The project includes a natural gas pipeline and an onshore gas processing plant, which commenced gas production in 2015.

This neuron ends here.

Source: Wikipedia "Corrib gas project" · CC BY-SA 4.0

Share this article: X · Bluesky
Privacy Policy