Load duration curve

A load duration curve (LDC) is used in electric power generation to illustrate the relationship between generating capacity requirements and capacity utilization. A LDC is similar to a load curve but the demand data is ordered in descending order of magnitude, rather than chronologically.

Source: Wikipedia — Load duration curve (CC BY-SA 4.0)

Load duration curve

A load duration curve (LDC) is used in electric power generation to illustrate the relationship between generating capacity requirements and capacity utilization. A LDC is similar to a load curve but the demand data is ordered in descending order of magnitude, rather than chronologically.

This neuron ends here.

Source: Wikipedia "Load duration curve" · CC BY-SA 4.0

Share this article: X · Bluesky
Privacy Policy