Nyagak III Hydroelectric Power Station
Nyagak III Power Station is an operational 6.6 megawatts (8,900 hp) mini hydroelectric power project, in Uganda. The completed power station was commissioned on 1 August 2025 by Ruth Nankabirwa, the Ugandan Energy Minister.
Source: Wikipedia — Nyagak III Hydroelectric Power Station (CC BY-SA 4.0)