Operation Phoenix (railway)

Operation Phoenix was a post-World War II rehabilitation program carried out by the Victorian Railways (VR) in Australia. The program commenced in 1950 and was originally planned to take 10 years and cost £80 million.

Source: Wikipedia — Operation Phoenix (railway) (CC BY-SA 4.0)

Operation Phoenix (railway)

Operation Phoenix was a post-World War II rehabilitation program carried out by the Victorian Railways (VR) in Australia. The program commenced in 1950 and was originally planned to take 10 years and cost £80 million.

Source: Wikipedia "Operation Phoenix (railway)" · CC BY-SA 4.0

Share this article: X · Bluesky
Privacy Policy