Pre-determined overhead rate
A pre-determined overhead rate is the rate used to apply manufacturing overhead to work-in-process inventory. The pre-determined overhead rate is calculated before the period begins.
Source: Wikipedia — Pre-determined overhead rate (CC BY-SA 4.0)