White House Big Dig
The White House Big Dig was the name used in press reports to describe a multi-year construction project at the White House that began in September 2010 and temporarily concluded in 2012, with a second phase planned for the future. According to the General Services Administration (GSA), the $376-million project, which involved a multi-story excavation adjacent to the West Wing, was to replace electrical wiring and update air conditioning.